Monterey County Subdivision Committee
Thursday, April 8, 2004
Board of Supervisors Chambers, Monterey County Courthouse
Church and Alisal Streets, Salinas, CA
(831) 755-5025
A. ROLL CALL: 9:30 AM
B. PUBLIC COMMENT PERIOD
C. APPROVAL OF MINUTES: March 11, 2004
D. SCHEDULED ITEMS
E. OTHER ITEMS: (no items scheduled)
F. ADJOURNMENT
Standard Subdivision Committee
9:30AM
1. CARMEL VALLEY RANCH LLP (PLN020280)
PROJECT LOCATION: ONE OLD RANCH RD CARMEL
PLANNING AREA: Carmel Valley Master Plan Area
PROJECT PLANNER: LUIS OSORIO
ENVIRONMENTAL STATUS: Negative Declaration Prepared
CONTINUED FROM 3/11/04. COMBINED DEVELOPMENT PERMIT INCLUDING: 1) STANDARD SUBDIVISION TENTATIVE MAP FOR THE SUBDIVISION OF AN EXISTING, APPROXIMATELY 218-ACRE PARCEL INTO 12 RESIDENTIAL LOTS APPROXIMATELY 6.8 TO 16.9 ACRES IN SIZE AND 4 OPEN SPACE PARCELS TOTALLING APPROXIMATELY 99 ACRES; 2) USE PERMIT FOR DEVELOPMENT ON SLOPES GREATER THAN 30% FOR CONSTRUCTION OF AN ACCESS ROAD; 3) USE PERMIT FOR REMOVAL OF 193 PROTECTED OAK TRESS; 4) ZONING RECLASSIFICATION TO REZONE 11 EXISTING LOTS IN THE OAKSHIRE SUBDIVISION FROM "MDR/5-D-S" (MEDIUM DENSITY RESIDENTIAL) TO "O-D-S" (OPEN SPACE); AND 5) ASSIGNMENT OF THE "LDR/B-6-D-S" ZONING CLASSIFICATION (LOW DENSITY RESIDENTIAL WITH BUILDING SITE, DESIGN AND SITE REVIEW OVERLAYS) TO THE RESIDENTIAL PORTION OF THE PROPOSED SUBDIVISION AND THE "O-D-S" ZONING CLASSIFICATION (OPEN SPACE WITH DESIGN AND SITE REVIEW OVERLAYS) TO THE OPEN SPACE PORTIONS OF THE SUBDIVISION. THE SITE OF THE PROPOSED SUBDIVISION IS LOCATED IN THE AREA DESIGNATED AS "LAND RESERVE" IN THE CARMEL VALLEY RANCH SPECIFIC PLAN. THE SUBDIVISION WOULD NOT RESULT IN THE CREATION OF ADDITIONAL LOTS AS 11 OF THE PROPOSED RESIDENTIAL LOTS WOULD SUBSTITUTE 11 EXISTING UNDEVELOPED LOTS IN THE OAKSHIRE SUBDIVISION OF THE SPECIFIC PLAN. THE PROJECT SITE (ASSESSOR'S PARCEL NUMBERS 416-522-020-000 & 416-522-017-000) IS LOCATED IN THE SOUTHWESTERN PORTION OF THE CARMEL VALLEY RANCH WITH PORTIONS FRONTING ON ROBINSON CANYON ROAD, CARMEL VALLEY MASTER PLAN.
 
Recommended Action: Consider Item
 
10:00AM
2. PEBBLE BEACH COMPANY (PLN010254)
PROJECT LOCATION: DEL MONTE FOREST PEBBLE BEACH
PLANNING AREA: Del Monte Forest Area
PROJECT PLANNER: THOM MCCUE
ENVIRONMENTAL STATUS: Environmental Impact Report Prepared
PEBBLE BEACH COMPANY'S DEL MONTE FOREST PRESERVATION AND DEVELOPMENT PLAN (see also PLN010341 and PLN040160)

A COMBINED DEVELOPMENT PERMIT COMPOSED OF THE FOLLOWING:

PROPOSED GOLF COURSE (AREA MNOUV)
A COMBINED DEVELOPMENT PERMIT CONSISTING OF A CONDITIONAL CERTIFICATE OF COMPLIANCE; GENERAL DEVELOPMENT PLAN FOR THE GOLF COURSE; COASTAL DEVELOPMENT PERMIT FOR VESTING TENTATIVE PARCEL MAP TO CREATE TWO PARCELS (PLUS TWO OPEN SPACE PARCELS); COASTAL DEVELOPMENT PERMIT AND DESIGN APPROVAL FOR THE DEMOLITION OF THE EXISTING EQUESTRIAN CENTER, A SINGLE-FAMILY HOME AND TWO COTTAGES, THE CONSTRUCTION OF AN 18 HOLE GOLF COURSE INCLUDING UNDERGROUND MAINTENANCE BUILDING, CLUBHOUSE, 11 FREE STANDING VISITOR-SERVING SUITES (24 ROOMS), TWO ON-COURSE RESTROOMS, EXPANSION OF DRIVING RANGE AND CONSTRUCTION OF GOLF EQUIPMENT BUILDING (INCLUDING RESTROOM, STORAGE, AND PARKING); COASTAL DEVELOPMENT PERMIT FOR DEVELOPMENT WITHIN 100 FEET OF ESHA; COASTAL DEVELOPMENT PERMIT FOR DEVELOPMENT ON SLOPES OF 30% OR MORE; GRADING (318,000 CY CUT AND 377,000 CY FILL); TREE REMOVAL (ESTIMATED 9,582 MONTEREY PINES AND 501 COAST LIVE OAK PLUS 170 MONTEREY PINE AND 23 COAST LIVE OAK FOR IMPROVEMENTS ALONG CONGRESS ROAD); RESOURCE MANAGEMENT; ONSITE ROAD/UTILITY/TRAIL IMPROVEMENTS; OFF-SITE ROAD, WATER, SEWER, AND STORMDRAIN IMPROVEMENTS. (APNS 008-241-008; 008-242-007; 008-272-010; 008-272-011; 008-311-011; 008-312-002; 008-313-002; 008-313-003; 008-321-006; 008-321-007; 008-321-008; 008-321-009), PEBBLE BEACH/ SPYGLASS PLANNING AREAS, DEL MONTE FOREST LUP, COASTAL ZONE.

NEW EQUESTRIAN CENTER (SAWMILL BORROW SITE)
A COMBINED DEVELOPMENT PERMIT CONSISTING OF A GENERAL DEVELOPMENT PLAN FOR THE EQUESTRIAN CENTER; COASTAL DEVELOPMENT PERMIT AND DESIGN APPROVAL FOR CONSTRUCTION OF THE EQUESTRIAN CENTER, INCLUDING A ONE-STORY EQUESTRIAN CLUBHOUSE BUILDING WITH LOCKER ROOMS, OFFICES, AND LOUNGE, A TWO-STORY DORMITORY BUILDING COMPLETE WITH KITCHEN AND COMMON AREA TO BE USED FOR OVERNIGHT EQUESTRIAN CAMPS FOR CHILDREN AND ADULTS, A COVERED ARENA AND STALL BARN, FOUR ONE-STORY STALL BARNS AND TWO COVERED TIE-STALL BARNS, A HAY BARN, A VEHICLE STORAGE BUILDING, TWO ONE-STORY SINGLE FAMILY RESIDENCES, ONE TWO-STORY FOUR FAMILY STAFF RESIDENTIAL STRUCTURE, A COVERED LUNGE RING, COVERED HORSE CORRAL SHELTERS, FENCED TRAINING RINGS, CORRALS ENTRY WALL, AND EXPANSION AREA FOR EQUESTRIAN EVENTS; COASTAL DEVELOPMENT PERMIT FOR DEVELOPMENT WITHIN 100 FEET OF ESHA; COASTAL DEVELOPMENT PERMIT FOR DEVELOPMENT ON SLOPES OF 30% OR MORE; GRADING (26,850 CY CUT AND 41,354 CY FILL); TREE REMOVAL (ESTIMATED 1,913 MONTEREY PINE, INCLUDING PLANTED TREES, 485, COAST LIVE OAK 273 PLANTED BISHOP PINE AND 536 PLANTED GOWEN CYPRESS); RESOURCE MANAGEMENT; ONSITE ROAD, TRAIL AND UTILITY IMPROVEMENTS; OFF-SITE ROAD, WATER, RECLAIMED WATER, AND SEWER IMPROVEMENTS. (PORTION OF APN 008-041-009); GOWEN CYPRESS PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

SPANISH BAY RESORT
A COMBINED DEVELOPMENT PERMIT CONSISTING OF AN AMENDMENT TO THE GENERAL DEVELOPMENT PLAN FOR THE SPANISH BAY RESORT; COASTAL DEVELOPMENT PERMIT AND DESIGN APPROVAL FOR THE CONSTRUCTION OF TWO THREE-STORY VISITOR-SERVING BUILDINGS OF 40 AND 46 UNITS, THE REMODEL OF EXISTING OFFICE SPACE TO ALLOW 5 ADDITIONAL GUEST UNITS, AN ADDITION TO THE EXISTING INN FACILITY TO CREATE AN ADDITIONAL 14,042 SQ. FT. OF MEETING ROOM SPACE, DEMOLITION OF EXISTING TENNIS COURTS AND PRO SHOP, CONSTRUCTION OF A 443-SPACE UNDERGROUND PARKING GARAGE, RECONSTRUCTION OF TENNIS COURTS AND PRO SHOP AND ADDITION OF 1,800 SQ FT OF LOCKER SPACE TO THE EXISTING MAIN CLUBHOUSE BUILDING, CIRCULATION AND PARKING IMPROVEMENTS; GRADING (44,252 CY CUT); TREE REMOVAL (ESTIMATED 52 MONTEREY PINE); ONSITE ROAD/UTILITY IMPROVEMENTS; OFF-SITE ROAD IMPROVEMENTS. (APN 007-091-028) SPANISH BAY PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

SPANISH BAY DRIVING RANGE
COASTAL DEVELOPMENT PERMIT FOR A VESTING TENTATIVE PARCEL MAP TO CREATE TWO PARCELS (PLUS TWO OPEN SPACE PARCELS AND ONE PARCEL FOR ROAD PURPOSES); COASTAL DEVELOPMENT PERMIT AND DESIGN APPROVAL FOR CONSTRUCTION OF GOLF DRIVING RANGE AND GOLF TEACHING FACILITY OF APPROXIMATELY 3,000 SQ. FT. AND PARKING; COASTAL DEVELOPMENT PERMIT FOR DEVELOPMENT WITHIN 100 FEET OF ESHA; GRADING (12,293 CY CUT AND 31,977 CY FILL); TREE REMOVAL (ESTIMATED 1,424 MONTEREY PINE AND 558 COAST LIVE OAK); RESOURCE MANAGEMENT; ONSITE ROAD, AND UTILITY IMPROVEMENTS; OFF-SITE RECLAIMED WATER AND STORMDRAIN IMPROVEMENTS. (PORTION OF APN 007-101-041) SPANISH BAY PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

SPANISH BAY EMPLOYEE HOUSING
COASTAL DEVELOPMENT PERMIT AND DESIGN APPROVAL FOR THE CONSTRUCTION OF 12 UNITS OF EMPLOYEE HOUSING; GRADING (7,874 CY CUT AND 655 CY FILL); TREE REMOVAL (ESTIMATED 191 MONTEREY PINE AND 73 COAST LIVE OAK); RESOURCE MANAGEMENT; ONSITE ROAD/UTILITY/TRAIL IMPROVEMENTS; OFF-SITE STORMDRAIN IMPROVEMENTS. (PORTION OF APN 007-101-041) SPANISH BAY PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

THE LODGE AT PEBBLE BEACH
A COMBINED DEVELOPMENT PERMIT CONSISTING OF AN AMENDMENT TO THE GENERAL DEVELOPMENT PLAN FOR THE LODGE AT PEBBLE BEACH; COASTAL DEVELOPMENT PERMIT AND DESIGN APPROVAL FOR THE ADDITION OF APPROXIMATELY 500 SQ. FT. OF MEETING SPACE AND THE REMODEL OF EXISTING MEETING FACILITIES (TOTAL MEETING SPACE: 5,500 SQ. FT.), PLUS 3,250 SQ. FT. OF CIRCULATION, SUPPORT AREAS, RESTROOMS AND ACCESSIBILITY IMPROVEMENTS; COASTAL DEVELOPMENT PERMIT AND DESIGN APPROVAL FOR THE REMOVAL OF FIVE EXISTING VISITOR-SERVING ROOMS AND CONSTRUCTION OF A NEW STRUCTURE WITH 43 NEW VISITOR-SERVING UNITS ("FAIRWAY ONE" BUILDING) WITH UNDERGROUND PARKING SPACES, PRIVATE DINING ROOM AND BANQUET KITCHEN; COASTAL DEVELOPMENT PERMIT AND DESIGN APPROVAL FOR CONSTRUCTION OF A NEW STRUCTURE WITH 20 NEW VISITOR-SERVING UNITS AND SUPPORT FACILITIES ("COLTON BUILDING"); COASTAL DEVELOPMENT PERMIT AND DESIGN APPROVAL FOR CONSTRUCTION OF A NEW 224 SPACE SURFACE (ONE LEVEL) AND UNDERGROUND (ONE LEVEL) PARKING FACILITY, AND 23 NEW SPACES OF SURFACE PARKING IN THE UPPER BANK PARKING AREA; COASTAL DEVELOPMENT PERMIT FOR A LOT LINE ADJUSTMENT TO RECONFIGURE 11 LOTS TO ESTABLISH 7 LOTS (PLUS ONE ROADWAY PARCEL); GRADING (26,929 CY OF CUT AND 5,030 CY FILL); TREE REMOVAL (ESTIMATED 26 MONTEREY PINE, 67 COAST LIVE OAK, AND TWO PLANTED CYPRESS TREES ) RE-ALIGNMENT OF PARKING, CIRCULATION, AND ACCESS, CONSTRUCTION OF ON- AND OFF-SITE, WATER, SEWER, AND STORM DRAIN IMPROVEMENTS. (APN'S 008-423-019; 008-423-029; 008-423-030; 008-423-031; 008-431-009) PEBBLE BEACH PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

RESIDENTIAL SUBDIVISION: AREA F-2
COASTAL DEVELOPMENT PERMIT FOR A VESTING TENTATIVE SUBDIVISION MAP FOR 10 PARCELS AVERAGING 1.7 ACRES (PLUS TWO PARCELS FOR OPEN SPACE AND ONE PARCEL FOR ROAD PURPOSES); GRADING (1500 CY CUT); TREE REMOVAL (ESTIMATED 708 MONTEREY PINES); RESOURCE MANAGEMENT; ONSITE ROAD/UTILITY/TRAIL IMPROVEMENTS; OFF-SITE SEWER, WATER AND STORMDRAIN IMPROVEMENTS. (APN 008-032-004) GOWEN CYPRESS PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

RESIDENTIAL SUBDIVISION: AREA F-3
COASTAL DEVELOPMENT PERMIT FOR A VESTING TENTATIVE SUBDIVISION MAP FOR 4 PARCELS AVERAGING 1.8 ACRES (PLUS TWO PARCELS FOR OPEN SPACE AND ONE PARCEL FOR ROAD PURPOSES); COASTAL DEVELOPMENT PERMIT FOR DEVELOPMENT ON SLOPES OF 30% OR MORE; GRADING (800 CY CUT); TREE REMOVAL (ESTIMATED 229 MONTEREY PINE); RESOURCE MANAGEMENT; ONSITE ROAD/UTILITY/TRAIL IMPROVEMENTS; OFF-SITE SEWER, AND STORMDRAIN IMPROVEMENTS. (APN 008-032-006) GOWEN CYPRESS PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

RESIDENTIAL SUBDIVISION: AREA I-2
COASTAL DEVELOPMENT PERMIT FOR A VESTING TENTATIVE SUBDIVISION MAP FOR 11 PARCELS AVERAGING 1.3 ACRES (PLUS FOUR PARCELS FOR OPEN SPACE PURPOSES); GRADING (200 CY CUT); TREE REMOVAL (ESTIMATED 301 MONTEREY PINE); RESOURCE MANAGEMENT; ONSITE ROAD/UTILITY/TRAIL IMPROVEMENTS; OFF-SITE SEWER AND STORMDRAIN IMPROVEMENTS. (APN 008-031-014) MIDDLE FORK PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

RESIDENTIAL SUBDIVISION: AREA K
COMBINED DEVELOPMENT PERMIT CONSISTING OF A CONDITIONAL CERTIFICATE OF COMPLIANCE; A COASTAL DEVELOPMENT PERMIT FOR A VESTING TENTATIVE PARCEL MAP TO CREATE ONE 2.95 ACRE PARCEL (PLUS ONE FOR OPEN SPACE PURPOSES); TREE REMOVAL (ESTIMATED 41 MONTEREY PINE AND 16 COAST LIVE OAK); RESOURCE MANAGEMENT; OFF-SITE WATER IMPROVEMENTS. (APNS 008-022-031; 008-022-032) SPYGLASS CYPRESS PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

RESIDENTIAL SUBDIVISION: AREA PQR
COMBINED DEVELOPMENT PERMIT CONSISTING OF A CONDITIONAL CERTIFICATE OF COMPLIANCE; A COASTAL DEVELOPMENT PERMIT FOR A VESTING TENTATIVE SUBDIVISION MAP TO CREATE 7 PARCELS AVERAGING 1.8 ACRES (PLUS ONE FOR OPEN SPACE PURPOSES); COASTAL DEVELOPMENT PERMIT FOR DEVELOPMENT ON SLOPES OF 30% OR MORE; GRADING (275 CY CUT); TREE REMOVAL (ESTIMATED 693 MONTEREY PINE AND 46 COAST LIVE OAK); RESOURCE MANAGEMENT; ONSITE ROAD/UTILITY/TRAIL IMPROVEMENTS; OFF-SITE SEWER AND STORMDRAIN IMPROVEMENTS. (APNS 008-163-001; 008-163-003; 008-163-005; 008-164-001; 008-171-009; 008-171-022) SPYGLASS CYPRESS PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

HIGHWAY 1/ HIGHWAY 68/ 17-MILE DRIVE IMPROVEMENTS
COAST DEVELOPMENT PERMIT AND DESIGN APPROVAL TO CONSTRUCT IMPROVEMENTS TO THE INTERSECTION OF HIGHWAY 68, HIGHWAY 1, AND THE 17 MILE DRIVE. IMPROVEMENTS WOULD WIDEN OFF-RAMP OF SOUTHBOUND HIGHWAY 1 FOR A LEFT-TURN LANE, RECONFIGURE THE SOUTHBOUND HIGHWAY 1 ON-RAMP TO PROVIDE A DEDICATED AND SIGNALIZED PEBBLE BEACH ENTRANCE, PROVIDE A RIGHT TURN MERGE LANE TO HIGHWAY 1 ON-RAMP, REDESIGN ENTRY-GATES TO MAKE VISITOR ACCESS MORE EFFICIENT, AND IMPROVE RESIDENT AND EMPLOYEE ACCESS, AND PROVIDE A SECOND EASTBOUND LAND ALONG HIGHWAY 68 FROM EAST OF THE SCENIC DRIVE OVERCROSSING TO THE INTERSECTION WITH HIGHWAY 1; GRADING (17,070 CY OF CUT AND 11,033 CY FILL) TREE REMOVAL (53 PLANTED MONTEREY PINE); IRRIGATION AND STORM DRAINAGE. PESCADERO PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.

PRESERVATION AND CONSERVATION AREAS
APPLICANT GRANTING OF SCENIC AND CONSERVATION EASEMENTS AND INITIATION OF ONGOING RESOURCE MANAGEMENT ACTIVITIES WITHIN 492 ACRES WITHIN THE FOLLOWING SITES: 20.3 ACRES WITHIN PRESERVATION AREA B (PORTION OF APN 007-101-041); 17.1 ACRES WITHIN PRESERVATION AREA D (PORTION OF APN 008-041-009); 47.9 ACRES WITHIN PRESERVATION AREA G (APN 008-041-009); 53.8 ACRES WITHIN PRESERVATION AREA H (APN'S 008-031-015, 008-034-001); 38.2 ACRES WITHIN PRESERVATION AREA I-1 (APN 008-031-017); 0.8 ACRES WITHIN PRESERVATION AREA J (APN 008-561-020); 18.2 ACRES WITHIN PRESERVATION AREA L (APN 008-031-008); 233.1 ACRES WITHIN PRESERVATION AREA PQR (PORTIONS OF APNS 008-163-001, 008-163-003, 008-163-005, 008-164-001, 008-171-009, AND 008-171-022); 6.9 ACRES WITHIN THE CORPORATION YARD PRESERVATION AREA (PORTION OF APN 008-041-009); 39.9 ACRES WITHIN THE PROPOSED GOLF COURSE CONSERVATION AREAS: SIGNAL HILL DUNES AND BRISTOL CURVE (PORTIONS OF APNS 008-242-007 AND 008-272-011); 3.3 ACRES WITHIN CONSERVATION DEDICATION WITHIN AREA C (PORTION OF APN 007-101-041); 8.6 ACRES WITHIN CONSERVATION AREA F-3 (PORTION OF APN 008-032-006); AND 3.9 ACRES WITHIN CONSERVATION AREA K (PORTION OF APN 008-021-009)

 
Recommended Action: Recommend Approval of Project to Planning Commission
 
10:00AM
3. PEBBLE BEACH COMPANY (pln010341)
PROJECT LOCATION: DEL MONTE FOREST, PEBBLE BEACH
PLANNING AREA: Del Monte Forest Area
PROJECT PLANNER: THOM MCCUE
ENVIRONMENTAL STATUS: Environmental Impact Report Prepared
PEBBLE BEACH COMPANY'S DEL MONTE FOREST PRESERVATION AND DEVELOPMENT PLAN (see also PLN010254 and PLN040160)

AN AMENDMENT TO A COMBINED DEVELOPMENT PERMIT APPLICATION (PC92-173) CONSISTING OF AN AMENDMENT TO THE GENERAL DEVELOPMENT PLAN FOR THE CORPORATION YARD AREA; COASTAL DEVELOPMENT PERMIT FOR A VESTING TENTATIVE PARCEL MAP TO CREATE THREE PARCELS (A 20.65-ACRE SITE FOR THE EXISTING PEBBLE BEACH COMPANY CORPORATION YARD; A 13.87-ACRE SITE FOR THE PROPOSED CORPORATION YARD EMPLOYEE HOUSING PROJECT; AND A 45.48-ACRE SITE FOR THE PROPOSED NEW EQUESTRIAN CENTER) AND A REMAINDER PARCEL (A 392.1-ACRE SITE FOR THE EXISTING HUCKLEBERRY HILL NATURAL AREA SITE); COASTAL DEVELOPMENT PERMIT AND DESIGN APPROVAL FOR THE CONSTRUCTION OF 48 EMPLOYEE HOUSING UNITS; COASTAL DEVELOPMENT PERMIT FOR DEVELOPMENT ON SLOPES OF 30% OR MORE; GRADING (38,557 CY CUT; 25,019 CY FILL); TREE REMOVAL (ESTIMATED 8 MONTEREY PINE); RESOURCE MANAGEMENT; ONSITE ROAD/UTILITY/TRAIL IMPROVEMENTS; OFF-SITE ROAD, TRAIL, SEWER, WATER, AND STORMDRAIN IMPROVEMENTS. (PORTION OF APN 008-041-009) HUCKLEBERRY HILL PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.
 
Recommended Action: Recommend Approval of Project to Planning Commission
 
10:00AM
4. PEBBLE BEACH COMPANY (PLN040160)
PROJECT LOCATION: SAWMILL BORROW SITE
PLANNING AREA: Del Monte Forest Area
PROJECT PLANNER: THOM MCCUE
ENVIRONMENTAL STATUS: Environmental Impact Report Prepared
PEBBLE BEACH COMPANY'S DEL MONTE FOREST PRESERVATION AND DEVELOPMENT PLAN (see also PLN010254 and PLN010341)

COASTAL DEVELOPMENT PERMIT TO AMEND AN APPROVED USE PERMIT (PC05040) DELETING CONDITIONS OF APPROVAL NUMBER 8, 9, AND 10, RELATING TO GRADING, SEEDING, AND VEGETATION OF THE SAWMILL BORROW SITE. (APN 008-041-009); GOWEN CYPRESS PLANNING AREA, DEL MONTE FOREST LUP, COASTAL ZONE.
 
Recommended Action: Recommend Approval of Project to Planning Commission