Name: |
Monterey-Salinas Transit Bus Maintenance and Operations Facility and
Whispering Oaks Business Park |
|
File number (s): |
PLN090071 |
Location:
(Vicinity Map:) |
North of Intergarrison Road, East of the 7th Avenue/Intergarrison
Road intersection in the Former Fort Ord |
|
Assessor's Parcel Number (s): |
031-101-056-000 & 031-101-041-000 |
|
Planning Area: |
Fort Ord |
|
Planner: |
Craig Spencer, Associate Planner (831) 755-5233 |
|
Current
Status: |
Appealed |
|
Environmental Status: |
FEIR Prepared |
|
Project Description: |
The proposed project consists of 1) Rezone to change the zoning
designation on approximately 58 acres of the former Army landfill site
from Public Quasi-Public to Heavy Commercial; 2) A Standard
Subdivision Phased Vesting Tentative Map consisting of subdividing two
parcels of 30.3 acres and 85.2 acres (Assessor’s Parcel Numbers
031-101-041-000 & 031-101-056-000) into 16 buildable lots (Lots 1-16)
ranging in size from 1 acre to 3 acres, a roadway parcel
(approximately 7.4 acres, Parcel A), a drainage detention and
percolation parcel (approximately 1.7 acres, Parcel B), and two Open
Space parcels (approximately 48.9 acres, Parcel C & 8.71 acres, Parcel
D); 3) A General Development Plan for the proposed commercial
Whispering Oaks Business Park; 4) A General Development Plan and Use
Permit to allow the development of a Monterey-Salinas Transit (MST)
administrative and maintenance facility containing the following: A) a
36,000 square foot three-story administrative building; B) a 96,450
square foot two-story bus maintenance building; C) an 18,620 square
foot fuel/brake/tire building (with underground tanks) attached to an
8,373 square foot bus wash/steam cleaning building by a canopy; and D)
Approximately 15 acres of paved parking to accommodate up to 281
busses and 388 automobiles; 5) A Use Permit to allow the removal of
approximately 2,400 Coast Live Oak tress on Lot 1 (MST parcel); 6) Use
Permit to allow the removal of approximately 2,000 Coast Live Oaks on
Lots 2 through 16, Parcel A and Parcel B; and 7) A disposition and
development agreement to convey the 24.37 acre Lot 1 from the
Redevelopment Agency of Monterey County to Monterey-Salinas Transit
(MST). Phasing of the project will be done as follows: Phase 1 will
consist of Lot 1 including development of the new administrative and
maintenance bus facility as described above, off-site drainage basins
to intercept storm run-off from the south, minor improvements to an
existing access Road (Engineer’s Equipment Road), frontage
improvements on Intergarrison Road and gas line relocation for CSUMB.
Phase 2 will consist of Lots 2 through 11 including road improvements
(parcel A) and drainage detention for the newly created lots (Parcel
B). Phase 3 will consist of Lots 12 through 16 and Parcels C& D
completing the Whispering Oaks Business Park parcels and the to Open
Space parcels. |
|
Key
Dates: |
- Standard Subdivision Committee - February 10,
2011.
- FEIR Release - February 25, 2011.
- Planning Commission - March 9, 2011.
- Board of Supervisors consideration of Appeal -
June 14, 2011.
|
|
Reports/Documents: |
|
|
Related
Links:
(These links are provided for information
only. The County of Monterey does not endorse any of the
information found on these sites)
|
|
|