Pebble Beach Final Environmental Impact Report (FEIR) (April 2012)

Volume III:  Comments, Responses to Comments, and Revisions to the Draft EIR:
  • Cover Page
  • Title Page
  • Table of Contents
  • Acronyms and Abbreviations
Chapter 1:
  • Introduction
Chapter 2:
  • Comments Received on the Draft EIR
Chapter 3:  Response to Comments
  • Response to Comment Letter 1 - (USFWS)
  • Response to Comment Letter 2 - (CCC)
  • Response to Comment Letter 3 - (Caltrans)
  • Response to Comment Letter 4 - (City of Monterey)
  • Response to Comment Letter 5 - (MBUAPCD)
  • Response to Comment Letter 6 - (MPWMD-1)
  • Response to Comment Letter 7 - (MPWMD-2)
  • Response to Comment Letter 8 - (PBCSD)
  • Response to Comment Letter 9 - (TAMC)
  • Response to Comment Letter 10 - (CNPS)
  • Response to Comment Letter 11 - (LandWatch)
  • Response to Comment Letter 12 - LWV-1)
  • Response to Comment Letter 13 - (MPFW-1)
  • Response to Comment Letter 14 - (MPFW-2)
  • Response to Comment Letter 15 - (Skyline)
  • Response to Comment Letter 16 - (TOMP)
  • Response to Comment Letter 17 - (Hale)
  • Response to Comment Letter 18 - (Scifres)
  • Response to Comment Letter 19 - (Stilwell)
  • Comments Received Late
    - Response to Comment Letter 20 - (HOPE)
    - Response to Comment Letter 21 - (LWV-2)
    - Response to Comment Letter 22 - (Blum-1)
    - Response to Comment Letter 23 - (Blum-2)
Chapter 4:  Revisions to the Draft EIR
  • Introduction
  • Revisions to Volume I Draft EIR
    - Acronyms and Abbreviations
    - Executive Summary
    - Chapter 1 - Introduction
    - Chapter 2 - Project Description
    - Chapter 3.0 - Introduction
    - Chapter 3.1 - Aesthetics
    - Chapter 3.2 - Air Quality
    - Chapter 3.3 - Biological Resources
    - Chapter 3.4 - Climate Change
    - Chapter 3.5 - Cultural Resources
    - Chapter 3.6 - Geology, Seismicity and Soils
    - Chapter 3.7 - Hydrology and Water Quality
    - Chapter 3.8 - Land Use and Recreation
    - Chapter 3.9 - Noise and Vibration
    - Chapter 3.10 - Public Utilities and Services
    - Chapter 3.11 - Transportation and Circulation
    - Chapter 3.12 - Water Supply and Demand
    - Chapter 4 - Other CEQA Required Sections
    - Chapter 5 - Alternatives
         Alternative 1 - Clustered Development Options
         Alternative 5 - Roundabout at the SR 1/SR 68/17-Mile Drive Interchange
    - Chapter 6 - Report Preparation
    - Chapter 7 - References
  • References Added for the FEIR
  • Revisions to Volume II Draft EIR Appendicies
    - Appendix A - Notice of Preparation and Written Comments
    - Appendix B - Proposed Roadway Improvements
    - Appendix C - Master Resource Management Plan
    - Appendix D - Proposed Monterey County Local Coastal Program Amendment
    - Appendix E - Air Quality and Climate Change information for Analysis
    - Appendix F - Biological Resources information for Analysis
    - Appendix G - Transportation and Circulation information for Analysis
    - Appendix H - Water Supply and Demand Information for Analysis
Errata May 2012