Project Name: Venoco, exploratory oil wells.  (On Appeal)
File number (s): Avila Trust, PLN090118, Ward Trust, PLN090119, Porter Estate Company, PLN090120
Location:
(Vicinity Map:)
South County Area
Assessor's Parcel Number (s): 423-091-040-000, 424-101-023-000, & 424-081-016-000.
Planning Area: South County Area Plan
Planners: Ramon A. Montano (831) 755-5169 and Taven Kinison-Brown (831) 755-5173
Current Status: Complete
Environmental Status: CEQA Actions:  Statutorily Exempt per CEQA Guidelines Section 15270, CEQA does not apply to projects which a public agency rejects or disapproves.  Alternatively, if the project is not denied staff recommends that an Environmental Impact Report (EIR) be prepared.
Project Description:

The project proposed by Venoco Corporation is to drill up to nine (9) total exploratory oil and natural gas wells. There are three proposed sites (1b, 7a, 34b) each site will contain up to three (3) exploratory oil and gas wells on a single pad. The drilling of the second and then the third exploratory wells on each pad is dependent upon the results of the testing for the first well. The project will be completed in two phases: 1) a site preparation phase, road grading for the purpose of access to each of the proposed sites; and development of pads to locate a stable drilling platform for the exploratory drilling equipment and the construction of ancillary non permanent structures; and 2) the drilling and testing phase. The project will require Use Permits for each parcel as required under the zoning code because the wells are located on separate parcels. Well site #7a, is located in Section 7, (Township 24 South, Range 11 East). The site is approximately 0.60 miles south west of Highway 101 and approximately 0.90 miles south east of Jolon Road, (Assessor's Parcel Number 424-101-023-000). Well site #1bis located in Township 24 South, Range 10 East, Section 1, .5 miles west of Highway 101 and 0.20 miles north of Jolon Road (Assessor's Parcel Number 424-081-016-000); and well site #34bis located in Township 23 South, Range10 East, Section 34. The site is approximately 2.2 miles west of state Highway 101 and approximately 0.90 miles north of Jolon Road (Assessor's Parcel Number 423-091-040-000). The three project sites are located along the west side of Highway 101 within the South County Area Plan. The project will require a total of 30,010 cubic yards of grading. The soil will be redistributed on each site to create a pad for each of the three drilling platforms. Project site 7a will require 2,770 cubic yards of cut and 2,560 cubic yards of fill. Project site 1b will require 8,970 cubic yards of cut and 8,240 cubic yards of fill, site 34b will require 18,270 cubic yards of cut and 16,320 cubic yards of fill. The remainder 2,890 cubic yards of spoils will remain on each respective site.

Key Dates:

 

1.  Appeal Hearing before the Planning Commission October 26, 2011.

2.  Anticipated Hearing Date September 9, 2010 was continued to September 30, 2010.

3.  Review period July 21, 2010 to August 19, 2010 (Second Review Period).

4.  Review period April 1st  2010 to April 30th  2010. (First Circulation).
 

Reports/Documents:

Related Links:
(These links are provided for information only.  The County of Monterey does not endorse any of the information found on these sites)

 

 

 

 

 

© 2008 Monterey County RMA Agency. All rights reserved.
Questions or Comments? Planning Department Webmaster
Disclaimer