County of Monterey Home Page
                   
 

 

 

September Ranch
(Page is currently being updated)

The September Ranch Project Revised Water Demand Analysis, a recirculated portion of the 2006 September Ranch Revised Environmental Impact Report (EIR), has been released for public review and is now available on this website.  See Reports and Documents below.

A copy of the document and technical appendices may be purchased at the Planning Department offices in Salinas at 168 West Alisal, 2nd Floor.  The cost for a hard copy is $17.  The document is also available on CD for $5.

All documents, including the supporting documents, are available for public review at the Planning Department in Salinas.
 

Project Name: September Ranch
File Number(s): PLN050001 (Combined Development Permit)
Note: The original file number for this project was PC95062
Location:
(Vicinity Map)
2.5 Miles East Of Highway 1 on the North Side of Carmel Valley Road, between Canada Way and Valley Greens Drive, Mid-Carmel Valley Area
Assessor's Parcel Number (s): 015-171-010-000; 015-171-012; 015-361-013-000;
015-361-014-000
Planning Area: Carmel Valley Master Plan
Planner: Laura Lawrence (831) 755-5148 and/or Alana Knaster (831) 755-5322
Current Status: Continued to a date uncertain.
Environmental Status:

Circulation of a portion (Revised Water Demand Analysis) of the Final Revised Environmental Impact Report (EIR)

Project Description:

A Combined Development Permit consisting of the following:
     1) a Vesting Tentative Map for the : a) Subdivision of 891 Acres into 73 Market-Rate Residential Lots and 22 Inclusionary Housing Lots for a total of 95 Residential Lots; b) a 20.2-acre Existing Equestrian Facility and accessory structures related to that use (Lot 101); c) 536.4 acres of Common Open Space (Parcels A, C & D);  d) 273.6 acres of Private Open Space (Scenic Easement) on each lot outside of the Building Envelope; e) 6.9 acres of Open Space Reserved for future public facilities (Parcel B); and f) Annexation to the Carmel Area Wastewater District for sewage disposal;
     2) A Use Permit for the Public/Commercial Use of the Equestrian Center & Stables; 
     3) A Use Permit for an on-site water system including new wells, backup well(s), booster pumps, water tanks and piping for fire suppression and residents of the Subdivision;
     4) A Use Permit for removal of a maximum of 819 protected Coast Live Oaks; 
     5) An Administrative Permit for up to 97,000 cubic yards of grading in an "S" (Site Plan Review) Overlay Zoning District for subdivision infrastructure and improvements; 
     6) A Use Permit to allow development on slopes greater than 30 percent for Inclusionary Housing on Lots 5 Through 11, Subdivision Infrastructure, and Subdivision Improvements; and 
     7) An Administrative Permit for Inclusionary Housing, Equestrian Center Caretaker Unit/Public Office, a Temporary Tract Sales Office, and a Security Gatehouse.

Key Dates: The public review period of the recirculated portion of the Final Revised EIR runs from August 12, 2009 until 5:00 pm on September 28, 2009. 
 
Reports/Documents:
Related Links: September Ranch Main Page-archived
 

 

 

© 2008 Monterey County RMA Agency. All rights reserved.
Questions or Comments? Planning Department Webmaster
Disclaimer