Contractor Notification for Start of OWTS Installation

Print
Press Enter to show all options, press Tab go to next option

Published on May 12, 2017. Last modified on July 28, 2017

Please correct the field(s) marked in red below:

stop 

OWTS (septic system) installers are required to inform the Environmental Health Bureau 24 hours before beginning installation of a septic system. OWTS installers must have a copy of the permit available at all times during construction of the system.

1
Contractor Name:
 *
2
Contractor Contact Phone Number:
 *
3
Property Address:
 *
4
OWTS Permit No.:
 *
5
Construction Permit No. (if applicable):
6
Planned Start Date of Installation:
 *
7
Estimated Date of Final Inspection:

Failure to notify the EHB is a violation of Monterey County Code, Chapter 15.20, and may result in additional fees.

It is the responsibility of the property owner or the owner’s applicant to provide the installer of the OWTS with a copy of the OWTS permit. The OWTS installation must be completed by a contractor licensed by the California State Contractor’s Board to install onsite wastewater treatment systems. The design specifications indicated on the permit and all Special Conditions appearing on the permit must be followed unless prior authorization is obtained from an Environmental Health Bureau Specialist.